 |
|
� |
�Document
6: Drawing 2534(2) [PMO neg. no. 20943/19] � |
� |
� |
� |
� |
� |
Kl�ranlage
K.G.L. B.A. III BW 18 Sewage treatment plant PWO camp Birkenau camp
III, BW 18 PROVISORISCHE ERDBECKEN Kl�ranlage III / Provisional earth
basins, sewage plant III Scale 1:200 �
Drawing 2524(2) drawn by
prisoner 23346 on 15/6/43, checked by an unknown and approved by Bischoff on
5/7/43. |
� |
� |
� |
� |
� |
Translation of
inscriptions� |
� |
� |
� |
� |
���� |
Die H�hen sind
auf Adria bezogen / heights are with respect to “Adriatic”
� |
� |
��� |
Holz Gel�nder /
wooden bridges� |
� |
��� |
Ma�stab 1:100 /
scale 1:100� |
� |
��� |
Verteilzunge mit
Detail / distribution gate [sluice] with detail � |
� |