BUILDING .3 The See also: art of building comprises the practice of See also:civil See also:architecture, or the See also:mechanical operations necessary to Relation carry the designs of the architect into effect. It is not of building infrequently called " See also:practical architecture," but the to arcbt- See also:adoption of this See also:form would See also:lead only to confusion, by Lecture. rendering it difficult to make the distinction generally understood between architecture (q.v.) as a See also:fine or liberal art, and architecture as a mechanical art. The See also:execution of See also:works of architecture necessarily includes building, but building is frequently employed when the result is not archi- ' See also:Teutonic See also:Mythology (1883-1884), (trans. Stalleybrass). 2 See also:Baring-See also:Gould on " See also:Foundations," See also:
He should be able to calculate the various strengths and strains to be placed on any portion of the structure, and have a See also: general knowledge of the building See also:trade, enabling him to See also:deal with any difficulty or defects that may arise. An important feature in the qualification of the architect is that he should be thoroughly conversant with the by-See also:laws of the different towns or districts, as to the requirements for the various classes of buildings, and the See also:special features of portions of the different buildings. The following are examples of the various buildings which he may have to See also:design, and the erection of which he may have to superintend:—dwelling-houses, domestic buildings, shops, dwellings for the working class, public buildings such as churches, See also:schools, hospitals, See also:libraries and hotels, factories of all kinds for all general trades, studios, electric See also:power stations, See also:cold storage buildings, stables and slaughter-houses. With regard to factories, places for the storage or making of different patent foods, and for slaughter of beasts intended for human See also:consumption, stringent by-laws are in most countries laid down and enforced by the public See also:health authorities. In See also:England, the Public Health Acts and By-laws are carried out by the various See also:borough or See also:district authorities, who appoint inspectors especially to study the health of the public with regard to sanitary arrangements. The inspectors have special See also:powers to deal with all improper or defective See also:food, or with any defects in buildings that may affect its cleanly preparation. In addition to See also:meeting the requirements of the clients, the various buildings have to be constructed and planned on clearly defined lines, according to the rules of the various Reasons authorities that See also:control their erection; thus the for special construction and planning of public schools are type of governed in England by the See also:board of See also:education, and plans' churches are governed by the various See also:societies that assist in financing the erection of these edifices; of these the Incorporated See also:
With regard to premises used in a combined way, as See also: shop and dwelling-See also:house, if in London, and the building exceeds 10 squares, or moo sq. ft. super in See also:area, the stairs and a large portion of the building must be built of fire-resisting materials. In the erection of London flats under certain conditions the stairs and corridors must be of fire-resisting materials, while in parts of New See also:York timber buildings are allowed; for illustrations of these see the See also:article CARPENTRY. In public buildings and theatres in London, See also:Paris and New York not only the construction, but also the exits and seating See also:accommodation and See also:stage, including the scenery See also:dock and flies, must conform to certain regulations. The conditions necessary for planning a successful building may be summarized as follows: (r) Ease of See also:access; (2) Good Conditions See also:light; (3) Good service; (4) Pleasing environment necessary and approaches; (5) Minimum cost with true See also:economy; for a in the See also:case of See also:office buildings, also ease of rearrange-successful 'ment to suit tenants. An architect should also be building. practically acquainted with all the modes of operation in all the trades or arts employed in building, and be able minutely to estimate beforehand the See also:absolute cost involved in the execution of a proposed structure. The power to do this necessarily involves that of measuring work (usually done by the quantity surveyor at an advanced stage of the work), and of ascertaining the quantities to be done. In See also:ordinary practice the architect usually cubes a building at a See also:price per See also:foot See also:cube, as will be described hereafter, but an architect should know how to measure and prepare quantities, or he cannot be said to be See also:master of his profession. Building includes what is called construction, which is the See also:branch of the See also:science of architecture See also:relating to the practical execution of the works required to produce any struc- cons:ruc- See also:ture • it will therefore be necessary to explain the Bon. subject in a general manner before entering upon building in detail. Although the styles of architecture have varied at different periods, buildings, wherever similar materials are employed, must be constructed on much the same principles. Scientific knowledge of the natures and properties of materials has, however, given to the See also:modern workman immense advantages over his See also:medieval See also:brother-craftsman, and caused many changes in the details of the trade, or art of building, although stones, bricks, See also:mortar, &c., then as now, formed the See also:element of the more solid parts of all edifices. The See also:object of constructions is to adapt, combine and See also:fit materials in such a manner that they shall retain in use the forms and dispositions assigned to them.If an General principles. upright See also:
That kind of stone is best fitted for the purposes of general construction which is least absorbent of moisture, and at the same See also:
Thus a See also: bridge consisting of a See also:series of See also:arches, however extensive, may be but one piece of construction, no arch being complete in itself without the collateral arches in the series to serve as its abutments, and the whole series being dependent thereby upon 764 the ultimate abutments of the bridge, without which the structure would not stand. This See also:illustration is not intended to apply to the older See also:bridges with widely distended masses, which render each See also:pier sufficient to abut the arches springing from it, but tend, in providing for a way over the See also:river, to choke up the way by the river itself, or to compel the river either to throw down the structure or else to destroy its own See also:banks. Some soils are liable to See also:change in form, expanding and See also:con- tracting under meteorological influences; such are See also:clays which swell when wetted and shrink when dried. See also:Concrete Founds- dons. foundations are commonly interposed upon such soils to protect the building from derangement from this cause; or walls of the cheaper material, concrete, instead of the more expensive brick or stone structure, are brought up from a level sufficiently below the ordinary See also:surface of the ground. When concrete is used to obviate the tendency of the soil to yield to pressure, expanse or extent of base is required, and the concrete being widely spread should therefore be deep or thick as a layer, only with reference to its own power of transmitting to the ground the weight of the wall to be built upon it, without breaking across or being crushed. But when concrete is used as a substitute for a wall, in carrying a wall down to a See also:low level, it is in fact a wall in itself, wide only in proportion to its See also:comparative weakness in the See also:absence of manipulated bond in its construction, and encased by the soil within which it is placed. When a concrete wall is used in place of brick the London Building Act requires an extra thickness of one-third; on the question of reinforced concrete no regulations as to thickness have at See also:present been made. The foundation of a building of ordinary weight is for the most part sufficiently provided for by applying what are technically Footings termed " footings " to the walls. The See also:reason for a to ways. footing is, that the wall obtains thereby a bearing upon a breadth of ground so much greater than its own width or thickness above the footing as to compensate for the difference between the power of resisting pressure of the wall, and of the ground or ultimate foundation upon which the wall is to See also:rest. It will be clear from this that if a building is to be erected upon rock as hard as the main constituent of the walls theoretically no See also:expanded footings will be necessary; if upon chalk, upon strong or upon weak gravel, upon See also:sand or upon clay, the footing must be expanded with reference to the power of resistance of the structure to be used as a foundation; whilst in or upon made ground or other loose and badly combined or imperfectly resisting soil, a solid See also:platform bearing evenly over the ground, and wide enough not to sink into it, becomes necessary under the constructed footing. For this purpose the easiest, the most See also:familiar, and for most purposes the most effectual and durable is a layer of concrete. The See also:English See also:government, when it has legislated upon building matters, has generally confined itself to making See also:provision that the enclosing walls of buildings should be formed of incombustible materials.In provisions regarding the least thicknesses of such walls, these were generally determined with reference to the height and length of the building. In the general and usual practice of developing See also: land at the present See also:day, the owner or freeholder of the land first consults an See also:Procedure architect and states his intentions of building, the Loran size of what he requires, what it is to be used for, if for intended trade how many hands he intends to employ, and the building. sub-buildings and departments, &c., that will be wanted. The architect gathers as much See also:information as he can as to his client's requirements, and from this information prepares his sketches. This first step is usually done with rough sketches or outlines only, and when approved by the client as regards the planning and situation of rooms, &c., the architect prepares the plans, elevations, and sections on the lines of the approved rough sketches; at the same time he strictly observes the building acts, and makes every portion of the building comply with these acts as regards the thickness of walls, open spaces, light and See also:air, distances from surrounding See also:property, frontage lines, and a See also:host of other points too numerous to mention, as far as he can interpret the meaning of the enactments. (The Londonand New York Building Acts are very extensive, with numerous amendments made as occasion requires.) An architect, whilst preparing the working drawings from the rough approved sketches, and endeavouring to conform with the Building Act requirements, often finds after consultation with the district surveyor, or the London See also:County See also:Council, or other See also:local authorities, that the plans have to be altered; and when so altered the client may disapprove of them, and thus delay often occurs in settling them. Another important point is that after the architect has obtained the consent of the building authorities, and also the approval of the client, then he may have to fight the adjoining owners with regard to See also:ancient See also:lights, or air space, or party walls. In the See also:city of London these last difficulties often mean the suspension of the work for a See also:long time, and a See also:great loss to the client. If the site is a large one, or the nature of the soil uncertain, trial holes should be sunk directly the See also:sketch plans are approved. (See FOUNDATIONS.) Where the property is leasehold there are always at this stage negotiations as to obtaining the approval of the See also:senior lessors and the freeholders; these having been obtained, the architect is then free to serve the various notices that may be required re party walls, &c. The See also:contract plans should be very carefully prepared, and sections, plans and elevations of all parts of the buildings and the levels from a datum See also:line be given. In addition to the general set of drawings, larger See also:scale details of the principal portions of the building should be given. If there are any existing buildings on the site these should be carefully surveyed and accurate detail plans be made for reference; this is especially necessary with regard to easements and rights of adjoining owners.Also in the preparation of the site See also: plan the various levels of the ground should be shown. The plans having been approved by all parties concerned; the next operation is the preparation of the See also:specification. This is a document which describes the materials to be used in the building, states how they are to be mixed, and how the various works are to be executed, and specifies every trade, and every portion of work in the building. The specification is necessary to enable the builder to erect the structure according to the architect's requirements, and is written by the architect; usually two copies of this document are made, one for the builder, the other for the architect, and the latter is signed as the contract copy in the same manner as the drawings. From the specification and drawings usually an approximate estimate of the cost of the proposed building is prepared by the architect, and the most general method adopted is to cube the building by a multiplication of the length, breadth and height of the building, and to multiply the product or cubic contents by a price ranging from fivepence to three shillings per cubic foot. In the case of churches, chapels and schools, the cost may be roughly computed by taking the number of seats at a price per seat. In the case of churches and chapels, taking a minimum area of $ ft. each, the cost varies from £io upwards, the difference being due to the amount of architectural embellishment or the addition of a See also:tower. Schools may be estimated as averaging £g per See also:scholar; we find that, taking schools of various sizes erected by the See also:late London School Board, their cost varied from £7:12:4 to £I0: is 10 per scholar. Hospitals vary from £I00 per bed upwards, the lowest cost being taken from a cottage See also:hospital type; while in the case of St See also:
The See also: idea is to be able to arrive at a lump sum for which the builders will undertake to erect the building. It is of frequent occurrence, in fact it occurs in four-fifths of building contracts, that when a building is commenced, the client, or other interested See also:person, will alter some portion, thereby causing deviations from the bills of quantities. By having the prices of the different materials before him, it is easy for the quantity surveyor to remeasure the portion altered, adding or deducting as the case may be, and thus to ascertain what difference the alteration makes. This method of bills of quantities and prices is absolutely necessary to any one about to build, and means a considerable saving to the client in the end. For example:—Suppose that bills of quantities are not prepared for a certain See also:job by a quantity surveyor, and, as is often done, the drawings and specification are sent to several builders asking them for a See also:quotation to build the house or factory or whatever it may be, according to the drawings and specification. The prices are duly sent in to the architect, and probably the lowest price is accepted and the successful builder starts the job. During the progress of the works certain alterations take place by the owner's instructions, and when the day of See also:settlement comes, the builder puts in his claim for " extras," then owing to the alterations and to the architect having no prices to work upon, litigation often ensues. Before the work of erecting a structure is entrusted to a builder he has to sign a contract in the same manner as the drawings and specification. This contract is an important document wherein the builder agrees to carry out the work for a stated sum of See also:money, in accordance with the drawings and specification, and bills of quantities, and instructions of the architect, and to his entire See also:satisfaction; and it also states the description of the materials and workmanship, and the manner of carrying out the work, responsibilities of the builder, particularly clauses indemnifying the employer against accidents to employees, and against numerous other risks, the time of completion of works under a See also:penalty for non-completion (the usual See also:allowance being made for bad weather, fire or strikes), and also how payments will be made to the builder as he proceeds with the building. This form of contract is generally prepared by the architect, and varies in part as may be necessary to meet the requirements of the case. When the drawings have been approved by the owner or client, also by the district surveyor or local authorities, and by adjoining owners, one copy of them, made on See also:linen, is usually deposited (in London) either with the district surveyor, or with the London County Council, another is prepared for the freeholder if a See also:lease of the land is granted, and a third is given to the builder. In addition, in complicated cases such as occur in the city of London, when a building is erected on land which has four or five distinct owners, an architect may have to prepare a large number of complete copies to be deposited with the various parties interested.The duties of the builder are very similar to those of the architect, except that he is not expected to be able to plan The and design, but to carry out the plans and designs of builder's the architect in the actual work of building. The See also: sphere. builder should also know the various acts, and in particular the acts specially relating to the erection of scaffoldings, hoardings, gantries, shoring and pulling down of old buildings. He should have a thorough knowledge of all materials, their qualifying marks or brands, and the special features of good and bad in each class, their uses and method of use. He should be able to control and See also:manage both the men and materials; and briefly, in a builder, as opposed to an architect, the constructive knowledge should predominate. On large or important works it is usual to have a clerk of works or delegate from the architect; his duties are to be on the works while they are in progress and endeavour by See also:constant See also:attention to secure the use of the best materials and construction, and to See also:report to the architect for his instruction any difficulties that may arise. He should be a thoroughly practical man as opposed to and is not included in the architect's remuneration. See also:American building acts agree in a general manner with those enforced in London. But whereas New York allows the erection of See also:frame or See also:wood structures, while defining a certain Amertcaa portion of the city inside which no new frame or wood praetice. structures shall be erected, in London and the large cities of Great See also:Britain the erection of wood frame buildings as dwellings is prohibited. In New York City provision is made for a space at the rear of domestic buildings at least io ft. deep, but such depth is increased when the building is over 6o ft. high, and is varied under special circumstances. In London this depth is the same, but the height of the building in relation to the space required in the rear thereof shall be constructed to keep within an See also:angle of 632 degrees, inclining from the rear boundary towards the building from the level of See also:pavement in front of building; the position from which the angle is taken is varied under special circumstances. In the smaller English towns the building regulations are framed on the model by-laws, and these increase the depth of the yard or See also:garden according to the height of the building.With regard to the strength and proportion of materials, these are not dealt with in the London Building Act to the same extent as in the New York; for example, in the New York acts (parts 4 and 5)1 it is prescribed that the bricks used shall be good, hard, well-burned bricks. The sand used for mortar shall be clean, See also:
Iron and steel construction is in its See also: infancy in England as compared with America, and probably this accounts for no special regulations being in force; but part 22 of the New York Building Code, See also:section rro to 129 inclusive, deals very fully with iron and steel construction, and this is further supplemented by sections 137 to 140 inclusive. Sanitary work is dealt with in London by section 39 of the Public Health (London) Act, and the drainage by-laws of the London County Council, in which every detail is very fully gone into with regard to the laying of drains, and fitting up of soil pipes, w.c.'s, &c., all of which is to be carried out and tested to the satisfaction of the local borough's sanitary inspector. The general requirements of New York with regard to sanitary work are very similar with a few more restrictions, and are carried out under " the rules and regulations for plumbing, drainage, ' Building and Health Laws and Regulations affecting the City of New York, including the Building Code of New York City as amended to 1st May 1903. 766 water-supply, and ventilation of buildings." The noticeable feature of the New York regulations is that all master plumbers have to be registered, which is not so in England. The New York regulations have 183 sections relating to sanitary work, and the English regulations have 96 sections. Also by part 16 of the Amendments to Plumbing Rules 1903, the New York laws require that, before any construction of, or alterations to, any gas piping or fittings are commenced, permits must be obtained from the See also:superintendent of buildings; these are only issued to a registered plumber. The application must be accompanied by plans of the different floors showing each outlet, and the number of burners to each outlet; a statement must also be made of the quality of the pipes and fittings, all of which are to be tested by the inspector. In London there are no such laws; the gas companies control a small portion of the work as regards the connexion to meters, while the insurance companies require gas jets to be covered with a See also:wire guard where liable to come in contact with inflammable goods. As to water, the various water companies in England have each their own set of regulations as to the kind of fittings and thickness and quality of See also:pipe to be used, whether for service, wastes or main. The importance of fire-resisting construction is being more fully recognized now by all countries. In France the regulations Fire- for factories, shops and workshops relating to " exits " resisting require that all doors should open outwardly when construe- they open on to courts, vestibules, staircases or tlon. interior passages. When they give access to the open air, outward opening is not obligatory unless it has been judged necessary in the interests of safety.If the doors open on to a passage or See also: staircase they must be fixed in such a manner as not to project into the passage or staircase when open. The exits must be numerous, and signs indicating the quickest way out are to be placed in conspicuous positions. The windows are to open outwardly. Staircases in offices or other buildings serving as places for work shall be constructed in incombustible materials, or shall be walled in fully in See also:plaster. The number of staircases shall be in proportion to the number of employees, &c. It is prohibited to use any liquid emitting vapours inflammable under 350 C. for the purpose of lighting or heating, unless the apparatus containing the liquid is solidly closed during work, that part of the apparatus containing the liquid being so closed as to avoid any oozing out of the liquid, &c. &c. Instructions are added as to precautions to be taken in case of fire. In London fire-resisting construction is dealt with in the London Building Act, and its second See also:schedule, and in London County Council See also:Theatre and Factory Acts, &c. In New York the building code (parts 19, 20 and 21) deals with fire appliances, escapes, and fire-See also:proof shutters and doors, fire-proof buildings and fire-proof floors, and requires that all See also:tenement houses shall have an iron See also:ladder for escape. A section somewhat similar to the last came into force in London in 1907 under the London Building Act, being framed with a view to require all existing projecting one-See also:storey shops to have a fire-resisting roof, and all existing buildings over 50 ft. in height to have means of escape to and from the roof in case of fire. There are several See also:patents now in use with which it would be possible to erect a fire-proof dwelling at small cost with walls 3 to 5 in. in thickness.One of these has been used where the building act does not apply, as in the case of the Newgate See also: prison cells, London, where the outside walls were from 3 to 4 in. thick only, and were absolutely fire and burglar proof. This method consists in using steel dovetailed sheets fixed between small steel stanchions and plastered in cement on both sides. This form of construction was also used at the See also:British See also:pavilion, Paris See also:Exhibition 1900, and has been employed in numerous other buildings in England, and also in See also:South See also:Africa, See also:Venezuela, and See also:India (See also:Delhi See also:durbar). The use of many of these convenient and sound forms of building construction for ordinary buildings in London, and in districts of England where the model by-laws are in force, is prohibited because they do not comply with some one or other of the various clauses relating to materials, or to the thickness of a wall. The various details of construction are described and illustrated under separate headings. See BRICKWORK, CARPENTRY, FOUNDATIONS, GLAZING, JOINERY, MASONRY, PAINTER-WORK, PLASTERING, Rooss, See also:SCAFFOLD, SHORING, STAIRCASE, STEEL CONSTRUCTION, STONE, TIMBER, WALL-COVERINGS, &C. The principal publications for reference in connexion with this subject are: The Building and Health Laws of the City of New York, See also:Brooklyn See also:Eagle Library, No. 85; Rules and Regulations affecting Building Operations in the administrative County of London, compiled by See also:Ellis Marsland; Annotated By-Laws as to House Drainage, &c., by See also:Jensen; See also:Metropolitan Sanitation, by Herbert Daw. (J.Additional information and CommentsThere are no comments yet for this article.
» Add information or comments to this article.
Please link directly to this article:
Highlight the code below, right click, and select "copy." Then paste it into your website, email, or other HTML. Site content, images, and layout Copyright © 2006 - Net Industries, worldwide. |
|
[back] BUHTURI [al-Walid ibn 'Ubaid Allah] (820-897) |
[next] BUILDING SOCIETIES |